Share:


Use of dynamic regression model for reduction of shortages in drug supply

Abstract

The study is given to the use of dynamic regression model for reduction of shortages in drug supply:


Purpose – the use of a dynamic regression model to identify the influence of lead-time on the reduction of time delays in drugs supply. To reach the goal, the author focuses on the improvement of drugs availability and the minimisation of time delays in drugs supply.


Research methodology – the application of dynamic regression method to minimise shortage. The author suggests a dynamic regression model and accompanies it with autocorrelation and heteroskedasticity tests: Breush-Godfrey Serial Correlation LM Test for autocorrelation and ARCH test for heteroskedasticity.


Findings – during analysis author identifies the relationship between lead-time and time delays in drugs supply. The author delivers a specific regression model to estimate the effect of deterministic lead-time on shortage. Probability F and Probability Chi-Square of this testing show that there is no significant autocorrelation and heteroskedasticity.


Research limitations – the research is delivered for a one-month time frame. For the future, the study could review other periods. The author has incorporated the lead-time component in shortage reduction study by leaving capacity uncertainty component unresearched. The future studies could incorporate both elements into shortage reduction case analysis.


Practical implications – presented framework could be useful for practitioners, which analyse drug shortage reduction cases. The revision of supply time table is recommended for pharmacies aiming to minimise the shortage level.


Originality/Value – the analysis of deterministic lead-time and identification that the periodicity of shortage is evident each eight days. The study contributes to lead-time uncertainty studies where most of the authors analyse the stochastic lead-time impact on shortages.

Keyword : supply, shortage, drugs, delays, regression, causes

How to Cite
Burinskienė, A. (2019). Use of dynamic regression model for reduction of shortages in drug supply. Business, Management and Economics Engineering, 17(2), 218-231. https://doi.org/10.3846/bme.2019.11297
Published in Issue
Dec 20, 2019
Abstract Views
1504
PDF Downloads
538
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

References

Azghandi, R., Griffin, J., & Jalali, M. S. (2018). Minimisation of drug shortages in pharmaceutical supply chains: A simulation-based analysis of drug recall patterns and inventory policies. Complexity, 2018, 6348413. https://doi.org/10.1155/2018/6348413

Cuatrecasas-Arbos, L., Fortuny-Santos, J., & Vintro-Sanchez, C. (2011). The operations-time chart: A graphical tool to evaluate the performance of production systems – from batch-and-queue to Lean Manufacturing. Computers & Industrial Engineering, 61(3), 663-675. https://doi.org/10.1016/j.cie.2011.04.022

Coomber, R., Moyle, L., & South, N. (2016). The normalisation of drug supply: The social supply of drugs as the “other side” of the history of normalisation. Drugs: Education, Prevention and Policy, 23(3), 255-263. https://doi.org/10.1016/j.drugpo.2017.01.016

Dinis-Carvalho, J., Moreira, F., Braganca, S., Costa, E., Alves, A., & Sousa, R. (2015). Waste identification diagrams. Production Planning & Control: The Management of Operations, 20(3), 235-247. https://doi.org/10.11113/jt.v76.3659

Heydari, J., Mahmoodi, M., & Taleizadeh, A. A. (2016). Lead time aggregation: A three-echelon supply chain model. Transportation Research Part E: Logistics and Transportation Review, 89, 215-233. https://doi.org/10.1016/j.tre.2016.03.006

Hoseini Shekarabi, S. A., Gharaei, A., & Karimi, M. (2019). Modelling and optimal lot-sizing of integrated multi-level multi-wholesaler supply chains under the shortage and limited warehouse space: generalised outer approximation. International Journal of Systems Science: Operations & Logistics, 6(3), 237-257. https://doi.org/10.1080/23302674.2018.1435835

Lacerda, A. P., Xambre A. R., & Alvelos, H. M. (2015). Applying value stream mapping to eliminate waste. International Journal of Production Research, 54, 1708-1720. https://doi.org/10.1080/00207543.2015.1055349

Lee, H. L., & Whang, S. (2000). Information sharing in a supply chain. International Journal of Technology Management, 20(3/4), 79-93. https://doi.org/10.1504/IJMTM.2000.001329

Mirzapour Al-e-Hashem, S. M. J., Baboli, A., & Sazvar, Z. (2013). A stochastic aggregate production planning model in a green supply chain: Considering flexible lead times, nonlinear purchase and shortage cost functions. European Journal of Operational Research, 230(1), 26-41. https://doi.org/10.1016/j.ejor.2013.03.033

Moshtagh, M. S., & Taleizadeh, A. A. (2017). Stochastic integrated manufacturing and remanufacturing model with shortage, rework and quality based return rate in a closed loop supply chain. Journal of Cleaner Production, 141, 1548-1573. https://doi.org/10.1016/j.jclepro.2016.09.173

Najid, N. M., Alaoui-Selsouli, M., & Mohafid, A. (2011). An integrated production and maintenance planning model with time windows and shortage cost. International Journal of Production Research, 49(8), 2265-2283. https://doi.org/10.1080/00207541003620386

Nia, A. R., Far, M. H., & Niaki, S. T. A. (2014). A fuzzy vendor managed inventory of multi-item economic order quantity model under shortage: An ant colony optimization algorithm. International Journal of Production Economics, 155, 259-271. https://doi.org/10.1016/j.ijpe.2013.07.017

Newman, D. J. (2016). Developing natural product drugs: Supply problems and how they have been overcome. Pharmacology and Therapeutics, 162, 1-9. https://doi.org/10.1016/j.pharmthera.2015.12.002

Osorio, A. F., Brailsford, S. C., & Smith, H. K. (2015). A structured review of quantitative models in the blood supply chain: a taxonomic framework for decision-making. International Journal of Production Research, 53(24), 7191-7212. https://doi.org/10.1080/00207543.2015.1005766

Paul, S., & Venkateswaran, J. (2017). Impact of drug supply chain on the dynamics of infectious diseases. System Dynamics Review, 33(3-4), 280-310. https://doi.org/10.1002/sdr.1592

Rau, H., Wu, M. Y., & Wee, H. M. (2004). Deteriorating item inventory model with shortage due to supplier in an integrated supply chain. International Journal of Systems Science, 35(5), 293-303. https://doi.org/10.1080/00207720410001714833

Rau, H., Wu, M. Y., & Wee, H. M. (2003). Integrated inventory model for deteriorating items under a multi-echelon supply chain environment. International Journal of Production Economics, 86(2), 155-168. https://doi.org/10.1016/S0925-5273(03)00048-3

Rivera, L., & Chen, F. F. (2007). Measuring the impact of lean tools on the cost–time investment of a product using cost–time profiles. Robotics and Computer-Integrated Manufacturing, 23(6), 684-689. https://doi.org/10.1016/j.rcim.2007.02.013

Sawik, T. (2017). A portfolio approach to supply chain disruption management. International Journal of Production Research, 55(7), 1970-1991. https://doi.org/10.1080/00207543.2016.1249432

Schmitt, T. G., Kumar, S., Stecke, K. E., Glover, F. W., & Ehlen, M. A. (2017). Mitigating disruptions in a multi-echelon supply chain using adaptive ordering. Omega, 68, 185-198. https://doi.org/10.1016/j.omega.2016.07.004

Snyder, L. V., Atan, Z., Peng, P., Rong, Y., Schmitt, A., & Sinsoysal, B. (2016). OR/MS Models for supply chain disruptions: a review. IIE Transactions, 48(2), 89-109. https://doi.org/10.2139/ssrn.1689882

Tiwari, S., Cárdenas-Barrón, L. E., Goh, M., & Shaikh, A. A. (2018). Joint pricing and inventory model for deteriorating items with expiration dates and partial backlogging under two-level partial trade credits in supply chain. International Journal of Production Economics, 200, 16-36. https://doi.org/10.1016/j.ijpe.2018.03.006