[1]
Sroka, B. and Radziszewska-Zielina, E. 2016. An exact solution for the resource-constrained construction scheduling problem. Engineering Structures and Technologies. 8, 2 (Jul. 2016), 71-78. DOI:https://doi.org/10.3846/2029882X.2016.1196916.