Share:


Influence of collaborative relationships on the performance of design-construction efficiency of industrialized construction

Abstract

The poor collaboration among the main actors in the construction has become a challenge for the low performance of the design-construction efficiency (DCE). This study investigated and quantitatively evaluated the influence of network relationships in stakeholders’ collaborative management (SCM) and their effect on the performance of the DCE of industrialized construction projects. Hypotheses were proposed and tested. Based on multiple empirical cases, semistructured interviews and questionnaire surveys were conducted. Social network analysis (SNA) was adopted as a research technique for graphical analysis and quantitative evaluation of the SCM. The study’s findings revealed that the different sets and modes of collaboration directly impacted the performance of the DCE of industrialized construction. Further findings showed that strong collaboration among the contractors, designers, and manufacturers significantly impacts achieving better efficiency. Meanwhile, DCE was the most important driving factor for the SCM. The network relationships had a positive impact on the DCE. The study contributes knowledge in demonstrating the application of network relationships in industrialized construction research and helps practitioners establish a strong SCM to improve the efficiency of industrialized construction in a wider global context.

Keyword : Design-construction efficiency (DCE), network relationships, stakeholders’ collaborative management (SCM), social network analysis (SNA), industrialized construction, industrialized house building

How to Cite
Daget, Y. T., & Zhang, H. (2023). Influence of collaborative relationships on the performance of design-construction efficiency of industrialized construction. Journal of Civil Engineering and Management, 29(5), 418–438. https://doi.org/10.3846/jcem.2023.18868
Published in Issue
Apr 19, 2023
Abstract Views
864
PDF Downloads
648
SM Downloads
270
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

References

Abbasi, A., Hossain, L., & Leydesdorff, L. (2011). Betweenness centrality as a driver of preferential attachment in the evolution of research collaboration networks. Journal of Informetrics, 6(3), 403–412. https://doi.org/10.1016/j.joi.2012.01.002

Abbasi, S., Taghizade, K., & Noorzai, E. (2020). BIM-based combination of takt time and discrete event simulation for implementing just in time construction scheduling under constraints. Journal of Construction Engineeing and Management, 146(12), 04020143. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001940

Adu, E. T., & Opawole, A. (2020). Assessment of performance of teamwork in construction projects delivery in South-Southern Nigeria. Journal of Engineering, Design and Technology, 18(1), 230–250. https://doi.org/10.1108/JEDT-01-2019-0025

Almalki, S. (2016). Integrating quantitative and qualitative data in mixed methods research – Challenges and benefits. Journal of Education and Learning, 5, 288. https://doi.org/10.5539/jel.v5n3p288

Antoncic, B., & Prodan, I. (2008). Alliances, corporate technological entrepreneurship and firm performance: Testing a model on manufacturing firms. Technovation, 28(5), 257–265. https://doi.org/10.1016/j.technovation.2007.07.005

Baiden, B. K., Price, A. D. F., & Dainty, A. R. J. (2006). The extent of team integration within construction projects. International Journal of Project Management, 24(1), 13–23. https://doi.org/10.1016/j.ijproman.2005.05.001

Bamgbade, J. A., Kamaruddeen, A. M., & Nawi, M. N. M. (2017). Malaysian construction firms’ social sustainability via organizational innovativeness and government support: The mediating role of market culture. Journal of Cleaner Production, 154, 114–124. https://doi.org/10.1016/j.jclepro.2017.03.187

Becerik-Gerber, B., Ku, K., & Jazizadeh, F. (2012). BIM-enabled virtual and collaborative construction engineering and management. Journal of Professional Issues in Engineering Education and Practice, 138(3), 234–245. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000098

Blayse, A. M., & Manley, K. (2004). Key influences on construction innovation. Construction Innovation, 4(3), 143–154. https://doi.org/10.1108/14714170410815060

Borgatti, S., Everett, M., & Freeman, L. (2002). UCINET for Windows: Software for social network analysis. University of Kentucky, USA.

Bresnen, M., & Marshall, N. (2000). Partnering in construction: a critical review of issues, problems and dilemmas. Construction Management and Economics, 18(2), 229–237. https://doi.org/10.1080/014461900370852

Briscoe, J., Nels Lee, T., & Fawcett, S. E. (2004). Benchmarking challenges to supply‐chain integration. Benchmarking: An International Journal, 11(2), 143–155. https://doi.org/10.1108/14635770410532589

Chapman, R. L., & Corso, M. (2005). From continuous improvement to collaborative innovation: the next challenge in supply chain management. Production Planning & Control, 16(4), 339–344. https://doi.org/10.1080/09537280500063269

Chen, H. H., Kang, H.-Y., Xing, X., Lee, A. H. I., & Tong, Y. (2008). Developing new products with knowledge management methods and process development management in a network. Computers in Industry, 59(2), 242–253. https://doi.org/10.1016/j.compind.2007.06.020

Childerhouse, P., Hermiz, R., Mason‐Jones, R., Popp, A., & Towill, D. R. (2003). Information flow in automotive supply chains – identifying and learning to overcome barriers to change. Industrial Management & Data Systems, 103(7), 491–502. https://doi.org/10.1108/02635570310489197

Chinowsky, P., Diekmann, J., & Galotti, V. (2008). Social network model of construction. Journal of Construction Engineering and Management, 134, 804–812. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(804)

Chinowsky, P. S., Diekmann, J., & O’Brien, J. (2010). Project organizations as social networks. Journal of Construction Engineering and Management, 136(4), 452–458. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000161

Costa, F., Granja, A., Fregola, A., Picchi, F., & Portioli-Staudacher, A. (2019). Understanding relative importance of barriers to improving the customer-supplier relationship within construction supply chains using DEMATEL technique. Journal of Management in Engineering, 35, 04019002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000680

Dainty, A. R. J., Bagilhole, B. M., & Neale, R. H. (2001). Male and female perspectives on equality measures for the UK construction sector. Women in Management Review, 16(6), 297–304. https://doi.org/10.1108/EUM0000000005820

De Marco, A., Rafele, C., & Thaheem, M. J. (2015). Dynamic management of risk contingency in complex design-build projects. Journal of Construction Engineering and Management, 142(2), 04015080. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001052

Donaldson, T., & Preston, L. E. (1995). The stakeholder theory of the corporation: Concepts, evidence, and implications. The Academy of Management Review, 20(1), 65–91. https://doi.org/10.2307/258887

Dubois, A., & Gadde, L.-E. (2000). Supply strategy and network effects – purchasing behaviour in the construction industry. European Journal of Purchasing & Supply Management, 6(3), 207–215. https://doi.org/10.1016/S0969-7012(00)00016-2

Eriksson, P. E. (2008). Procurement effects on coopetition in client-contractor relationships. Journal of Construction Engineering and Management, 134(2), 103–111. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:2(103)

Eriksson, P. E. (2010). Improving construction supply chain collaboration and performance: A lean construction pilot project. Supply Chain Management, 15, 394–403. https://doi.org/10.1108/13598541011068323

Eriksson, P. E., Atkin, B., & Nilsson, T. (2009). Overcoming barriers to partnering through cooperative procurement procedures. Engineering, Construction and Architectural Management, 16(6), 598–611. https://doi.org/10.1108/09699980911002593

Fellows, R., & Liu, A. M. M. (2012). Managing organizational interfaces in engineering construction projects: addressing fragmentation and boundary issues across multiple interfaces. Construction Management and Economics, 30(8), 653–671. https://doi.org/10.1080/01446193.2012.668199

Freeman, R. E. (1984). Strategic management: A stakeholder approach. Pitman.

Fulford, R., & Standing, C. (2014). Construction industry productivity and the potential for collaborative practice. International Journal of Project Management, 32(2), 315–326. https://doi.org/10.1016/j.ijproman.2013.05.007

Gilsing, V., & Nooteboom, B. (2006). Exploration and exploitation in innovation systems: The case of pharmaceutical biotechnology. Research Policy, 35(1), 1–23. https://doi.org/10.1016/j.respol.2005.06.007

Golob, K., Bastic, M., & Pšunder, I. (2013). Influence of project and marketing management on delays, penalties, and project quality in Slovene organizations in the construction industry. Journal of Management in Engineering, 29(4), 495–502. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000146

Granovetter, M. (1973). The strength of weak ties. American Journal of Sociology, 78(6), 1360–1380. https://doi.org/10.1086/225469

Harper, C., Molenaar, K., & Cannon, J. (2016). Measuring constructs of relational contracting in construction projects: The owner’s perspective. Journal of Construction Engineering and Management, 142, 04016053. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001169

Haythornthwaite, C. (1996). Social network analysis: An approach and technique for the study of information exchange. Library and Information Science Research, 18, 323–342. https://doi.org/10.1016/S0740-8188(96)90003-1

Haythornthwaite, C., & Wellman, B. (1998). Work, friendship, and media use for information exchange in a networked organization. Journal of the American Society for Information Science, 49(12), 1101–1114. https://doi.org/10.1002/(SICI)1097-4571(1998)49:12<1101::AID-ASI6>3.0.CO;2-Z

Hossain, M. A., & Nadeem, A. (2019). Towards digitizing the construction industry: State of the art of construction 4.0. In Proceedings of International Structural Engineering and Construction, 6(1). https://doi.org/10.14455/ISEC.res.2019.184

Hu, X., Chong, H.-Y., Wang, X., & London, K. (2019). Understanding stakeholders in off-site manufacturing: A literature review. Journal of Construction Engineering and Management, 145, 03119003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001674

Hughes, J., Jhon, P., & Sasse, G. (2002). From plan to network: Urban elites and the post-communist organizational state in Russia. European Journal of Political Resolution, 41(3), 395–420. https://doi.org/10.1111/1475-6765.00017

Indriani, M. N., Thanaya, I. N. A., Astana, N. Y., & Yana, A. A. G. A. (2020). Conceptual framework of knowledge sharing and project team performance relationship in design and build project. IOP Conference Series: Earth and Environmental Science, 419, 012012. https://doi.org/10.1088/1755-1315/419/1/012012

Ingirige, B., & Sexton, M. (2006). Alliances in construction. Engineering, Construction and Architectural Management, 13(5), 521–535. https://doi.org/10.1108/09699980610690774

Ismail, F., Yusuwan, N. M., & Baharuddin, H. E. A. (2012). Management factors for successful IBS projects implementation. Procedia - Social and Behavioral Sciences, 68, 99–107. https://doi.org/10.1016/j.sbspro.2012.12.210

Jalal, M. P., & Koosha, S. M. (2015). Identifying organizational variables affecting project management office characteristics and analyzing their correlations in the Iranian project-oriented organizations of the construction industry. International Journal of Project Management, 33(2), 458–466. https://doi.org/10.1016/j.ijproman.2014.06.010

Jansson, G. (2017). Flow-oriented contracting in industrialized house-building. In The International Conference on Construction and Real Estate Management (ICCREM 2016), Alberta, Canada. https://doi.org/10.1061/9780784480274.014

Jiang, L., Li, Z., Li, L., Li, T., & Gao, Y. (2018). A framework of industrialized building assessment in China based on the structural equation model. International Journal of Environmental Research and Public Health, 15(8), 1687. https://doi.org/10.3390/ijerph15081687

Jw, C. (1998). Qualitative inquiry and research design: Choosing among five traditions. Sage Publications.

Kadefors, A. (2005). Fairness in interorganizational project relations: norms and strategies. Construction Management and Economics, 23(8), 871–878. https://doi.org/10.1080/01446190500184238

Kedir, F., & Hall, D. M. (2021). Resource efficiency in industrialized housing construction – A systematic review of current performance and future opportunities. Journal of Cleaner Production, 286, 125443. https://doi.org/10.1016/j.jclepro.2020.125443

Kent, D. C., & Becerik-Gerber, B. (2010). Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management, 136(8), 815–825. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000188

Kishna, M., Niesten, E., Negro, S., & Hekkert, M. P. (2017). The role of alliances in creating legitimacy of sustainable technologies: A study on the field of bio-plastics. Journal of Cleaner Production, 155, 7–16. https://doi.org/10.1016/j.jclepro.2016.06.089

Kreiter, C., & Zaidi, N. B. (2020). Generalizability theory’s role in validity research: Innovative applications in health science education. Health Professions Education, 6(2), 282–290. https://doi.org/10.1016/j.hpe.2020.02.002

Le, P. L., Jarroudi, I., Dao, T.-M., & Chaabane, A. (2021). Integrated construction supply chain: an optimal decision-making model with third-party logistics partnership. Construction Management and Economics, 39(2), 133–155. https://doi.org/10.1080/01446193.2020.1831037

Lee, M., Ismail, S., & Wahab, M. H. (2014). Contractor’s performance for construction project: A review. International Journal of Engineering Research and Applications, 4, 131–137.

Lessing, J. (2006). Industrialized house-building: concept and processes. Lund Institute of Technology, Lund, Sweden.

Lessing, J., & Brege, S. (2018). Industrialized building companies’ business models: Multiple case study of Swedish and North American companies. Journal of Construction Engineering and Management, 144(2), 05017019. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001368

Lessing, J., Stehn, L., & Ekholm, A. (2005). Industrialised housing: Definition and categorization of the concept. In Proceedings of the 13th Conference of the International Group for Lean Construction (pp. 471–480). International Group for Lean Construction.

Lessing, J., Stehn, L., & Ekholm, A. (2015). Industrialised house-building: development and conceptual orientation of the field. Construction Innovation, 15(3), 378–399. https://doi.org/10.1108/CI-06-2014-0032

Leung, L. (2015). Validity, reliability, and generalizability in qualitative research. Journal of Family Medicine and Primary Care, 4(3), 324–327. https://doi.org/10.4103/2249-4863.161306

Li, H., Lu, W., & Huang, T. (2009). Rethinking project management and exploring virtual design and construction as a potential solution. Construction Management and Economics, 27(4), 363–371. https://doi.org/10.1080/01446190902838217

Li, L., Li, Z., Wu, G., & Li, X. (2018). Critical success factors for project planning and control in prefabrication housing production: A China study. Sustainability, 10(3), 836. https://doi.org/10.3390/su10030836

Liao, L., Man, Q., Teo, E. A. L., Li, L., & Li, X. (2014). Improving construction schedule and cost information feedback in building information modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), 91–99. https://doi.org/10.1680/mpal.13.00016

Lu, W., Xu, J., & Soderlund, J. (2020). Exploring the effects of Building Information Modeling on projects: Longitudinal social network analysis. Journal of Construction Engineering and Management, 146(5), 04020037. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001823

Marsden, P. V., & Campbell, K. E. (1984). Measuring tie strength. Social Forces, 63(2), 482–501. https://doi.org/10.2307/2579058

Mellado, F., & Lou, E. C. W. (2020). Building information modelling, lean and sustainability: An integration framework to promote performance improvements in the construction industry. Sustainable Cities and Society, 61, 102355. https://doi.org/10.1016/j.scs.2020.102355

Mignone, G., Hosseini, M. R., Chileshe, N., & Arashpour, M. (2016). Enhancing collaboration in BIM-based construction networks through organizational discontinuity theory: A case study of the new Royal Adelaide Hospital. Architectural Engineering and Design Management, 12(5), 333–352. https://doi.org/10.1080/17452007.2016.1169987

Mok, K. Y., Shen, G. Q., & Yang, J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), 446–457. https://doi.org/10.1016/j.ijproman.2014.08.007

Mok, M. K. Y., & Shen, G. Q. (2016). A network-theory based model for stakeholder analysis in major construction projects. In Creative Construction Conference, Hong Kong, China. https://doi.org/10.1016/j.proeng.2016.11.622

Murray, M., Dainty, A., & Moore, D. (2007). Communication in construction: Theory and practice. Routledge. https://doi.org/10.4324/9780203358641

Murtazova, K., & Aliev, S. (2021). Current state and development prospects of the construction industry. Nexo Revista Científica, 34, 916–925. https://doi.org/10.5377/nexo.v34i02.11619

Mustapha, M. A., Manan, Z. A., & Wan Alwi, S. R. (2017). Sustainable Green Management System (SGMS) – An integrated approach towards organisational sustainability. Journal of Cleaner Production, 146, 158–172. https://doi.org/10.1016/j.jclepro.2016.06.033

Nawi, M. N. M., Nadarajan, S., Omar, M. F., Zaidi, M. A., & Mat Yasin, M. F. (2014). Towards integrated team practice: A case of Malaysian Industrialised Building System (IBS) construction projects. MATEC Web of Conferences, 15, 01025. https://doi.org/10.1051/matecconf/20141501025

Nguyen, B. N., London, K., & Zhang, P. (2021). Stakeholder relationships in off-site construction: A systematic literature review. Smart and Sustainable Built Environment, 11(3), 765–791. https://doi.org/10.1108/SASBE-11-2020-0169

Noharia, N., & Eccles, R. G. (1992). Networks and organizations. Harvard Business School Press.

Olander, S., & Landin, A. (2005). Evaluation of stakeholder influence in the implementation of construction projects. International Journal of Project Management, 23(4), 321–328. https://doi.org/10.1016/j.ijproman.2005.02.002

Oraee, M., Hosseini, M. R., Papadonikolaki, E., Palliyaguru, R., & Arashpour, M. (2017). Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review. International Journal of Project Management, 35(7), 1288–1301. https://doi.org/10.1016/j.ijproman.2017.07.001

Ortega, I., & Bisgaard, S. (2000). Quality improvement in the construction industry: Three systematic approaches. Total Quality Management, 11, 383–392. https://doi.org/10.1080/09544120050007689

Pan, W., G. F., Gibb, A., & Dainty, A. R. J. (2007). Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(2), 183–194. https://doi.org/10.1080/01446190600827058

Park, H., Han, S. H., M. Rojas, E., Son, J., & Jung, W. (2011). Social network analysis of collaborative ventures for overseas construction projects. Journal of Construction Engineering and Management, 137(5), 344–355. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000301

Pemsel, S., & Wiewiora, A. (2013). Project management office a knowledge broker in project-based organisations. International Journal of Project Management, 31(1), 31–42. https://doi.org/10.1016/j.ijproman.2012.03.004

Project Management Institute. (2013). A guide to the project management body of knowledge. Newtown Square, PA. https://doi.org/10.1002/pmj.21345

Pryke, S. (2012). Social network analysis in construction. Wiley. https://doi.org/10.1002/9781118443132

Pryke, S., Badi, S., & Bygballe, L. (2017). Editorial for the special issue on social networks in construction. Construction Management and Economics, 35(8–9), 445–454. https://doi.org/10.1080/01446193.2017.1341052

Quinn, J. J. (1997). Personal ethics and business ethics: The ethical attitudes of owner/managers of small business. Journal of Business Ethics, 16(2), 119–127. https://doi.org/10.1023/A:1017901032728

Rowley, T. J. (1997). Moving beyond dyadic ties: A network theory of stakeholder influences. Academy of Management Review, 22(4), 887–910. https://doi.org/10.2307/259248

Rowley, T. J., & Moldoveanu, M. (2003). When will stakeholder groups act? An interest- and identity-based model of stakeholder group mobilization. Academy of Management Review, 28(2), 204–219. https://doi.org/10.2307/30040709

Rutten, M., Dorée, A., & Halman, J. (2009). Innovation and interorganizational cooperation: A synthesis of literature. Construction Innovation, 9(3), 285–297. https://doi.org/10.1108/14714170910973501

Safford, T. G., Carlson, M. L., & Hart, Z. H. (2009). Stakeholder collaboration and organizational innovation in the planning of the Deschutes Estuary feasibility study. Coastal Management, 37(6), 514–528. https://doi.org/10.1080/08920750903044774

Salleh, R. M., Mustaffa, N., Abdul Rahiman, N., Tajul Ariffin, H. L., & Othman, N. (2019). The propensity of building information modelling and integrated project delivery in building construction project. International Journal of Built Environment and Sustainability, 6, 83–90. https://doi.org/10.11113/ijbes.v6.n1-2.386

Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007

Sánchez, M. A. (2015). Integrating sustainability issues into project management. Journal of Cleaner Production, 96, 319–330. https://doi.org/10.1016/j.jclepro.2013.12.087

Savage, G. T., Nix, T. W., Whitehead, C. J., & Blair, J. D. (1991). Strategies for assessing and managing stakeholders. Academy of Management Executive, 5(2), 61–75. https://doi.org/10.5465/ame.1991.4274682

Setiawan, H., Erdogan, B., & Ogunlana, S. O. (2015, September 15–18). Proactiveness of contractors: A study of Indonesia. In 5th Euro Asia Civil Engineering Forum (EACEF), Petra Christian University, Surabaya, Indonesia.

Shehu, Z., Endut, I. R., Akintoye, A., & Holt, G. D. (2014). Cost overrun in the Malaysian construction industry projects: A deeper insight. International Journal of Project Management, 32(8), 1471–1480. https://doi.org/10.1016/j.ijproman.2014.04.004

Shen, L.-y., Tam, V. W. Y., Tam, L., & Ji, Y.-b. (2010). Project feasibility study: the key to successful implementation of sustainable and socially responsible construction management practice. Journal of Cleaner Production, 18(3), 254–259. https://doi.org/10.1016/j.jclepro.2009.10.014

Singh, M. M., Sawhney, A., & Borrmann, A. (2015). Modular coordination and BIM: Development of rule based smart building components. Procedia Engineering, 123, 519–527. https://doi.org/10.1016/j.proeng.2015.10.104

Soderlund, J. (2011). Pluralism in project management: Navigating the crossroads of specialization and fragmentation. International Journal of Management Review, 13(2), 153–176. https://doi.org/10.1111/j.1468-2370.2010.00290.x

Sooriyamudalige, N., Domingo, N., Shahzad, W., & Childerhouse, P. (2020). Barriers and enablers for supply chain integration in prefabricated elements manufacturing in New Zealand. International Journal of Construction Supply Chain Management, 10, 73–91. https://doi.org/10.14424/ijcscm100120-73-91

Sparkling, A. E., Mollaoglu, S., & Kirca, A. H. (2017). Research synthesis connecting trends in architecture, engineering, and construction project partnering. Journal of Management in Engineering, 33(1), 04016033. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000481

Steen, J., DeFillippi, R., Sydow, J., Pryke, S., & Michelfelder, I. (2018). Projects and networks: Understanding resource flows and governance of temporary organizations with quantitative and qualitative research methods. Project Management Journal, 49(2), 3–17. https://doi.org/10.1177/875697281804900201

Stock, J. R., & Lambert, D. M. (2001). Strategic logistics management. McGraw-Hill.

Sun, J., & Zhang, P. (2011). Owner organization design for mega industrial construction projects. International Journal of Project Management, 29(7), 828–833. https://doi.org/10.1016/j.ijproman.2011.04.005

Tam, V. W. Y., & Le, K. N. (2007). Quality improvement in construction by using a Vandermonde interpolation technique. International Journal of Project Management, 25(8), 815–823. https://doi.org/10.1016/j.ijproman.2007.03.009

Tan, Y., Xue, B., & Cheung, Y. (2017). Relationships between main contractors and subcontractors and their impacts on main contractor competitiveness: An empirical study in Hong Kong. Journal of Construction Engineering and Management, 143(7), 05017007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001311

Tchidi, M. F., He, Z., & Li, Y. B. (2012). Process and quality improvement using Six Sigma in construction industry. Journal of Civil Engineering and Management, 18(2), 158–172. https://doi.org/10.3846/13923730.2012.657411

Teng, Y., Mao, C., Liu, G., & Wang, X. (2017). Analysis of stakeholder relationships in the industry chain of industrialized building in China. Journal of Cleaner Production, 152, 387–398. https://doi.org/10.1016/j.jclepro.2017.03.094

Thunberg, M., & Fredriksson, A. (2018). Bringing planning back into the picture – How can supply chain planning aid in dealing with supply chain-related problems in construction? Construction Management and Economics, 36(8), 425–442. https://doi.org/10.1080/01446193.2017.1394579

Todo, Y., Matous, P., & Inoue, H. (2016). The strength of long ties and the weakness of strong ties: Knowledge diffusion through supply chain networks. Research Policy, 45(9), 1890–1906. https://doi.org/10.1016/j.respol.2016.06.008

Turner, J. R., & Muller, R. (2003). On the nature of the project as a temporary organization. International Journal of Project Management, 21(1), 1–8. https://doi.org/10.1016/S0263-7863(02)00020-0

Tykkä, S., McCluskey, D., Nord, T., Ollonqvist, P., Hugosson, M., Roos, A., Ukrainski, K., Nyrud, A. Q., & Bajric, F. (2010). Development of timber framed firms in the construction sector – Is EU policy one source of their innovation? Forest Policy and Economics, 12(3), 199–206. https://doi.org/10.1016/j.forpol.2009.10.003

Vibaek, K. S. (2014). Architectural system structures: Integrating design complexity in industrialised construction. Routledge. https://doi.org/10.4324/9781315771519

Wang, H., Lu, W., Soderlund, J., & Chen, K. (2018). The interplay between formal and informal institutions in projects: A social network analysis. Project Management Journal, 49(4), 20–35. https://doi.org/10.1177/8756972818781629

Wang, J., Zhao, J., & Hu, Z. (2016). Review and thinking on development of building industrialization in China. China Civil Engineering Journal, 49(5), 1–8.

Wasserman, S., & Faust, K. (1994). Social network analysis: methods and applications. Cambridge University Press. https://doi.org/10.1017/CBO9780511815478

Winch, G. M. (1989). The construction firm and the construction project: A transaction cost approach. Construction Management and Economics, 7(4), 331–345. https://doi.org/10.1080/01446198900000032

Winch, G. M. (2001). Governing the project process: A conceptual framework. Construction Management and Economics, 19(8), 799–808. https://doi.org/10.1080/01446190110074264

Winch, G. (2003). Models of manufacturing and the construction process: The genesis of re-engineering construction. Building Research & Information, 31(2), 107–118. https://doi.org/10.1080/09613210301995

Wu, P., Jin, R., Xu, Y., Lin, F., Dong, Y., & Pan, Z. (2021). TThe analysis of barriers to bim implementation for industrialized building construction: A China study. Journal of Civil Engineering and Management, 27(1), 1–13. https://doi.org/10.3846/jcem.2021.14105

Xie, H., Sumam, R. J., & Carey, N. (2020). Multivariate analysis on time-cost trade-off for production and installation in industrialized construction. In Construction Research Congress 2020: Project Management Controls, Materials, Contracts, Tempe, AZ, United States. https://doi.org/10.1061/9780784482889.030

Xue, X. (2011). Cognition and decision making in construction engineering management. In The 5th International Conference on Computer Sciences and Convergence Information Technology (ICCIT2011), Jeju, Republic of Korea.

Xue, X., Zhang, X., Wang, L., Skitmore, M., & Wang, Q. (2018a). Analyzing collaborative relationships among industrialized construction technology innovation organizations: A combined SNA and SEM approach. Journal of Cleaner Production, 173, 265–277. https://doi.org/10.1016/j.jclepro.2017.01.009

Xue, H., Zhang, S., Su, Y., Wu, Z., & Yang, R. J. (2018b). Effect of stakeholder collaborative management on off-site construction cost performance. Journal of Cleaner Production, 184, 490–502. https://doi.org/10.1016/j.jclepro.2018.02.258

Yang, J., Shen, G., Ho, M., Drew, D., & Chan, A. (2009). Exploring critical success factors for stakeholder management in construction projects. Journal of Civil Engineering and Management, 15(4), 337–348. https://doi.org/10.3846/1392-3730.2009.15.337-348

Yang, J., Shen, G. Q., Ho, M., Drew, D. S., & Xue, X. (2011). Stakeholder management in construction: An empirical study to address research gaps in previous studies. International Journal of Project Management, 29(7), 900–910. https://doi.org/10.1016/j.ijproman.2010.07.013

Yap, J. B. H., Leong, W. J., & Skitmore, M. (2020). Capitalising teamwork for enhancing project delivery and management in construction: Empirical study in Malaysia. Engineering, Construction and Architectural Management, 27(7), 1479–1503. https://doi.org/10.1108/ECAM-10-2019-0581

Yin, R. K. (2003). Case study research: Design and methods (3rd ed.). Sage Publications.

Yin, R. K. (2009). Case study research: Design and methods (4th ed.). Sage Publications.

Ying, J. F., Tookey, J., & Roberti, J. (2015). SCM competencies in construction: Issues and challenges in New Zealand. Journal of Engineering, Design and Technology, 13(4), 522–538. https://doi.org/10.1108/JEDT-01-2013-0002

Yu, T., Man, Q., Wang, Y., Shen, G. Q., Hong, J., Zhang, J., & Zhong, J. (2019). Evaluating different stakeholder impacts on the occurrence of quality defects in offsite construction projects: A Bayesian-network-based model. Journal of Cleaner Production, 241, 118390. https://doi.org/10.1016/j.jclepro.2019.118390