Share:


Scheduling model of construction activity with time couplings

    Zdzisław Hejducki Affiliation

Abstract

The algorithm of construction work graphic schedule which takes into account the proper sequencing problem has been presented. The algorithm is described step by step, ie the construction work organisation methods with zero couplings between realisation means. The calculation process of “Limit Possible Minimum” (LPM) taking into account technical and organisation limits is also shown. The second part of the paper includes a practical example which presents the method and the optimisation algorithm for the work organisation method with zero couplings among realisation means.


First Published Online: 26 Jul 2012

Keyword : scheduling model, construction, couplings

How to Cite
Hejducki, Z. (2003). Scheduling model of construction activity with time couplings. Journal of Civil Engineering and Management, 9(4), 284-291. https://doi.org/10.3846/13923730.2003.10531341
Published in Issue
Dec 31, 2003
Abstract Views
491
PDF Downloads
389
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.