[1]
Cho, K., Hong, T. and Hyun, C.T. 2013. Space zoning concept-based scheduling model for repetitive construction process.
Journal of Civil Engineering and Management
. 19, 3 (Jun. 2013), 409-421. DOI:https://doi.org/10.3846/13923730.2012.757561.