[1]
Lin, M.-C., Tserng, H.P., Ho, S.-P. and Young, D.-L. 2011. Developing a construction-duration model based on a historical dataset for building project. Journal of Civil Engineering and Management. 17, 4 (Dec. 2011), 529-539. DOI:https://doi.org/10.3846/13923730.2011.625641.