[1]
W. Bożejko, Z. Hejducki, M. Uchroński, and M. Wodecki, “Solving resource-constrained construction scheduling problems with overlaps by metaheuristic”, JCEM, vol. 20, no. 5, pp. 649-659, Jul. 2014.