1.
Lee C, Won J. Analysis of construction productivity based on construction duration per floor and per gross area, with identification of influential factors. JCEM [Internet]. 2021Mar.22 [cited 2024Dec.19];27(3):203-16. Available from: https://tede.vgtu.lt/index.php/JCEM/article/view/14514