1.
Al-Refaie A, Al-Hawadi A, Lepkova N, Abbasi G. Blockchain of optimal multiple construction projects planning under probabilistic arrival and stochastic durations. JCEM [Internet]. 2023Jan.3 [cited 2024Nov.15];29(1):15–34. Available from: https://tede.vgtu.lt/index.php/JCEM/article/view/17927