Vol 30 No 2 (2024)
Published: 2024-02-06
Articles
Buffering policies for prefabricated construction supply chain subject to material lead time and activity duration uncertainties
Abstract 791 | PDF Downloads 454 | DOI https://doi.org/10.3846/jcem.2024.20809
Page 99–113
Probabilistic management of pavement defects with image processing techniques
Abstract 759 | PDF Downloads 462 | DOI https://doi.org/10.3846/jcem.2024.20401
Page 114–132
The benefit evaluation framework of using performance-based contracting in urban road maintenance
Abstract 632 | PDF Downloads 318 | DOI https://doi.org/10.3846/jcem.2024.20491
Page 133–148
Determining concessionary items for “availability payment only” PPP projects: a holistic framework integrating value-for-money and social values
Abstract 776 | PDF Downloads 417 SM Downloads 132 | DOI https://doi.org/10.3846/jcem.2024.20841
Page 149–167
Empirical study toward corporate legal compliance and anti-corruption for top construction engineering consulting firms
Abstract 890 | PDF Downloads 498 | DOI https://doi.org/10.3846/jcem.2024.19554
Page 168–181
Structural equation model-based performance measurement system for transferring PPP water projects: a China perspective
Abstract 675 | PDF Downloads 339 | DOI https://doi.org/10.3846/jcem.2024.19788
Page 182–199