Vol 30 No 3 (2024)
Published: 2024-03-08
Articles
A review of agent-based modeling in construction management: an analytical framework based on multiple objectives
Abstract 1086 | PDF Downloads 559 | DOI https://doi.org/10.3846/jcem.2024.20949
Page 200–219
Adaptive LOB scheduling for optimizing resource leveling and consumption
Abstract 770 | PDF Downloads 354 | DOI https://doi.org/10.3846/jcem.2024.20952
Page 220–233
MIVES multi-criteria framework to sustainability index of design for manufacture and assembly
Abstract 767 | PDF Downloads 357 | DOI https://doi.org/10.3846/jcem.2024.20953
Page 234–247
Analysis of visual impact by new building height through UAVs and photogrammetry
Abstract 609 | PDF Downloads 223 | DOI https://doi.org/10.3846/jcem.2024.20957
Page 248–263
Back analysis and stability prediction of surrounding rock during excavation of the Shuangjiangkou underground powerhouse
Abstract 635 | PDF Downloads 233 | DOI https://doi.org/10.3846/jcem.2024.20778
Page 264–278
Risk assessment of subway station fire by using a Bayesian network-based scenario evolution model
Abstract 882 | PDF Downloads 356 | DOI https://doi.org/10.3846/jcem.2024.20846
Page 279–294