[1]
Błaszczyk, T. and Nowak, M. 2009. The time‐cost trade‐off analysis in construction project using computer simulation and interactive procedure. Technological and Economic Development of Economy. 15, 4 (Dec. 2009), 523-539. DOI:https://doi.org/10.3846/1392-8619.2009.15.523-539.