[1]
Löbner, B. 2006. Determination of the construction time for bridges over railway lines from the public clients’ perspective. Technological and Economic Development of Economy. 12, 3 (Sep. 2006), 215-221. DOI:https://doi.org/10.3846/13928619.2006.9637744.