[1]
Zagorskas, J. and Turskis, Z. 2020. Setting priority list for construction works of bicycle path segments based on Eckenrode rating and ARAS-F decision support method integrated in GIS. Transport. 35, 2 (Apr. 2020), 179-192. DOI:https://doi.org/10.3846/transport.2020.12478.