Bian, Zhan, Qi Xu, Na Li, and Zhihong Jin. 2018. “Scheduling for Yard Cranes Based on Two-Stage Hybrid Dynamic Programming”. Transport 33 (2):408–417. https://doi.org/10.3846/16484142.2016.1255993.