1.
Berezhnoy А, Grakovsky А, Nesterov А. The “green wave” mode production on the two‐lane highways during the construction works time period. Transport [Internet]. 2007Dec.31 [cited 2024Nov.25];22(4):263-8. Available from: https://tede.vgtu.lt/index.php/Transport/article/view/7808