Vol 22 No 7 (2016)
Published: 2016-07-12
Articles
Maximizing the value of residential projects using fuzzy rule based linear programming
Abstract 656 | PDF Downloads 1148 | DOI https://doi.org/10.3846/13923730.2014.914102
Page 853-861
Evaluating motivation of construction workers: a comparison of fuzzy rule-based model with the traditional expectancy theory
Abstract 1731 | PDF Downloads 2489 | DOI https://doi.org/10.3846/13923730.2014.914103
Page 862-873
Study on correlation between fire fighting time and fire loss in urban building based on statistical data
Abstract 786 | PDF Downloads 655 | DOI https://doi.org/10.3846/13923730.2014.914101
Page 874-881
Linear and nonlinear fractional hereditary constitutive laws of asphalt mixtures
Abstract 979 | PDF Downloads 668 | DOI https://doi.org/10.3846/13923730.2014.914104
Page 882-889
Establishing engineering S-curves to evaluate supervision engineer allocations for highway construction projects
Abstract 847 | PDF Downloads 1183 | DOI https://doi.org/10.3846/13923730.2014.928363
Page 890-902
Developing construction defect management system using BIM technology in quality inspection
Abstract 2294 | PDF Downloads 2576 | DOI https://doi.org/10.3846/13923730.2014.928362
Page 903-914
An insulation thickness optimization methodology for school buildings rehabilitation combining artificial neural networks and life cycle cost
Abstract 869 | PDF Downloads 704 | DOI https://doi.org/10.3846/13923730.2014.928364
Page 915-923
Fuzzy method for analysing uncertainty in the sustainable design of concrete structures
Abstract 1020 | PDF Downloads 717 | DOI https://doi.org/10.3846/13923730.2014.928361
Page 924-935
Information platform to improve technological innovation capabilities: role of cloud platform
Abstract 817 | PDF Downloads 672 | DOI https://doi.org/10.3846/13923730.2014.929023
Page 936-943
Time reduction effect of the enhanced TACT method for high-rise residential buildings
Abstract 725 | PDF Downloads 660 | DOI https://doi.org/10.3846/13923730.2014.945949
Page 944-953
Government motivation-embedded return guarantee for urban infrastructure projects based on real options
Abstract 775 | PDF Downloads 572 | DOI https://doi.org/10.3846/13923730.2016.1204362
Page 954-966
Proposing a neural network model to predict time and cost claims in construction projects
Abstract 1653 | PDF Downloads 1310 | DOI https://doi.org/10.3846/13923730.2016.1205510
Page 967-978
Corrigenda
Corrigendum
Abstract 577 | PDF Downloads 391 | DOI https://doi.org/10.3846/13923730.2016.1203479
Page 979